Overage and included amounts
Overage charges the rate for the source amount above an included threshold.
Quick overview
- Use a supported Rate Pricing source and check its Pricing unit.
- Enable Overage and enter the threshold in that unit.
- Test below, exactly on and above the threshold.
Configure included content
- For the example, create an enabled Fixed price component at 10 with Applies → Always.
- Create a second component using Rate Pricing, Source → Length, Pricing unit m and Rate 2.
- Enable Overage and enter Overage threshold 3. Save Component. Leave adjustments, Rounding and Minimum Price disabled for the example.
- At Length 5 m, only the additional 2 m contributes to this rate: 2 × 2 = 4. Together with the base, unit price is 14 and Quantity 2 totals 28.
Check thresholds and units
- Below or exactly on the threshold, the overage contribution is zero. Other applicable components may still provide the product price.
- The threshold belongs to the selected Pricing unit. Do not treat an included value in ft as the same numeric value in yd.
- A zero overage contribution does not guarantee that the complete configuration has a payable price. Check the other components and final result.